Charging Advice

You are here

2 posts / 0 new
Last post
strangjl
strangjl's picture
Charging Advice
SoftPlan Version:
2016 Plus

All,

I have been tasked with designing/drafting a Turkey Barn, 66 feet x 600 feet.

Basically this building has no interior walls and no floor. But it does have a lot of detail for openings, fans, electrical and special framing needs. I will be working with an engineer but his charge will be separate. The other consideration is this company has the possibility of building 100+ of these buildings with one set of plans.

 

Any advice on ways to charge for these types of building plans would be great.

 

Jeff

cbe
cbe's picture
For any residential work I'll

For any residential work I'll charge by the sq. ft. but everything else is charged by the hour.  I sometimes give someone a ballpark figure, but these projects always take more time than I originally think so I pad any estimate.

- Cory